SOUTH H ST over ARVIN-EDISON CANAL

0.2 MI S PANAMA LANE · County 029, California · Built 1965 · 4 Lanes · 3,950 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
50C0100
Year Built
1965
Reconstructed
1998
Length
14 m (45.9 ft)
Max Span
13.4 m
Width
27.1 m (88.9 ft)
Lanes
4
Daily Traffic
3,950
Material
Prestressed Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.