SR 204 (GOLDEN ST) over CHESTER AVE

06-KER-204-4.88-BKD · County 029, California · Built 2011 · 4 Lanes · 34,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
50 0505
Year Built
2011
Length
163 m (534.8 ft)
Max Span
24.1 m
Width
22.8 m (74.8 ft)
Lanes
4
Daily Traffic
34,000
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.