STATE ROUTE 58 EB over SOUTH P STREET

06-KER-058-R53.91-BKD · County 029, California · Built 1976 · 3 Lanes · 15,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
50 0405R
Year Built
1976
Reconstructed
2015
Length
38.1 m (125 ft)
Max Span
38.1 m
Width
17.8 m (58.4 ft)
Lanes
3
Daily Traffic
15,000
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.