STATE ROUTE 58 over HART FLAT ROAD

09-KER-058-80.24 · County 029, California · Built 1962 · 4 Lanes · 42,400 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
50 0253
Year Built
1962
Length
30.5 m (100.1 ft)
Max Span
12.2 m
Width
28.3 m (92.8 ft)
Lanes
4
Daily Traffic
42,400
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.