WILSON ROAD over STATE ROUTE 99
06-KER-099-22.11-BKD · County 029, California · Built 1962 · 5 Lanes · 40,000 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
35.332208, -119.039489
This bridge is in worse condition than 94.8% of bridges in County 029. The average bridge in California is 0 years old; this one is 64 years old.
Nearby Bridges
WIBLE ROAD over STATE ROUTE 99
Built 1962
MING AVENUE over STATE ROUTE 99
Built 1962
PLANZ ROAD over STATE ROUTE 99
Built 1962
WIBLE ROAD over MING AVE-N99 ON RAMP
Built 1962
WIBLE ROAD over N99-MING AVE OFF RAMP
Built 1962
BELLE TERRACE over STATE ROUTE 99
Built 2020
WHITE LANE over STATE ROUTE 99
Built 1962
WILSON RD over KERN ISLAND CANAL
Built 1955
SOUTH GATE DR over KERN ISLAND CANAL
Built 1957
MING AVE over KERN ISLAND CANAL
Built 1956
Bridge Details
- Structure #
- 50 0250
- Year Built
- 1962
- Reconstructed
- 1975
- Length
- 64.9 m (212.9 ft)
- Max Span
- 21.6 m
- Width
- 22.9 m (75.1 ft)
- Lanes
- 5
- Daily Traffic
- 40,000
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,486,000
- Total Project Cost
- $2,496,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.