STATE ROUTE 99 over POSO CREEK

06-KER-099-44.54 · County 029, California · Built 1951 · 6 Lanes · 59,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
50 0007
Year Built
1951
Reconstructed
1970
Length
43.6 m (143 ft)
Max Span
8.5 m
Width
41.1 m (134.8 ft)
Lanes
6
Daily Traffic
59,000
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.