RIVER ROAD over SALINAS RIVER
0.5 MI E MISSION ST · County 079, California · Built 2005 · 2 Lanes · 500 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
35.752697, -120.689925
This bridge is in worse condition than 73.9% of bridges in County 079. The average bridge in California is 0 years old; this one is 21 years old.
Nearby Bridges
US HIGHWAY 101 NB over TENTH STREET
Built 1957
US HIGHWAY 101 SB over TENTH STREET
Built 1957
US HIGHWAY 101 NB over MISSION ST-S101 ON RAMP
Built 1957
US HIGHWAY 101 SB over MISSION ST-S101 ON RAMP
Built 2020
US HIGHWAY 101 NB over S101-MISSION ST OFF-RAMP
Built 1957
US HIGHWAY 101 SB over S101-MISSION ST OFF-RAMP
Built 1965
INDIAN VALLEY RD over VINEYARD CREEK
Built 1980
US HIGHWAY 101 NB over UP RR & AMTRAK MISSION
Built 1965
US HIGHWAY 101 SB over UP RR & AMTRAK MISSION
Built 1965
US HIGHWAY 101 NB over SAN MARCOS CREEK
Built 2020
Bridge Details
- Structure #
- 49C0444
- Year Built
- 2005
- Length
- 337.3 m (1106.6 ft)
- Max Span
- 44.8 m
- Width
- 10.6 m (34.8 ft)
- Lanes
- 2
- Daily Traffic
- 500
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.