COTTONTAIL CR RD over COTTONTAIL CREEK

2.67 MI W OF CYPRESS MT R · County 079, California · Built 1940 · 1 Lanes · 100 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
49C0246
Year Built
1940
Length
9.8 m (32.2 ft)
Max Span
4.6 m
Width
5.4 m (17.7 ft)
Lanes
1
Daily Traffic
100
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.