BELL ACCESS RD over OAK CREEK
0.1 MI EOF BELL ACCESS RD · County 027, California · Built 1940 · 1 Lanes · 50 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Culvert
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 4 | Poor |
Location
36.832575, -118.22875
This bridge is in worse condition than 98.6% of bridges in County 027. The average bridge in California is 0 years old; this one is 86 years old.
Bridge Details
- Structure #
- 48C0032
- Year Built
- 1940
- Length
- 7.6 m (24.9 ft)
- Max Span
- 2.1 m
- Width
- 5.2 m (17.1 ft)
- Lanes
- 1
- Daily Traffic
- 50
- Material
- Concrete
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $89,000
- Total Project Cost
- $150,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.