U.S. HIGHWAY 6 over SPRING CANYON CK CHANNEL
09-MNO-006-R17.96 · County 051, California · Built 2002 · 2 Lanes · 2,060 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
37.712972, -118.429589
This bridge is in worse condition than 25% of bridges in County 051. The average bridge in California is 0 years old; this one is 24 years old.
Bridge Details
- Structure #
- 47 0062
- Year Built
- 2002
- Length
- 44 m (144.4 ft)
- Max Span
- 12.5 m
- Width
- 13.1 m (43 ft)
- Lanes
- 2
- Daily Traffic
- 2,060
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.