AVENUE 424 over TRAVER CANAL

0.25 MI EAST OF RD 64 · County 107, California · Built 2023 · 2 Lanes · 4,550 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
46C0481
Year Built
2023
Length
22.5 m (73.8 ft)
Max Span
21.2 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
4,550
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.