CONNER ST over PORTER SLOUGH

.3 MI N SR190 @SUCCESS DR · County 107, California · Built 1946 · 2 Lanes · 1,725 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
46C0299
Year Built
1946
Length
17.7 m (58.1 ft)
Max Span
5.8 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
1,725
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.