ROAD 168 over MIDDLE FORK TULE RIVER

0.8 MI N OF AVE 168 · County 107, California · Built 1980 · 2 Lanes · 375 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
46C0287
Year Built
1980
Length
15.5 m (50.9 ft)
Max Span
14.6 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
375
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.