M 112 over DEER CREEK
2.23 MI SE OF M120 · County 107, California · Built 1956 · 2 Lanes · 25 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
3
Serious
Superstructure
3
Serious
Substructure
0
Failed
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 3 | Serious |
| Superstructure | 3 | Serious |
| Substructure | 0 | Failed |
Location
35.973353, -118.883339
This bridge is in worse condition than 99.7% of bridges in County 107. The average bridge in California is 0 years old; this one is 70 years old.
Nearby Bridges
MOUNTAIN ROAD 112 over DEER CREEK
Built 2023
M 120 over DEER CREEK
Built 1967
ROAD M112 over DEER CREEK
Built 1967
ROAD M112 over DEER CREEK
Built 1939
M120 over DEER CREEK
Built 1967
ROAD 272 over DEER CREEK
Built 1967
SUCCESS VALLEY DR over SOUTH FORK TULE RIVER
Built 1967
IRR BIA RTE 70 over SOUTH FORK TULE RIVER
Built 1954
ROAD M109 over DEER CREEK
Built 1967
RD 284 over TULE RIVER
Built 1963
Bridge Details
- Structure #
- 46C0200
- Year Built
- 1956
- Reconstructed
- 1959
- Length
- 16.5 m (54.1 ft)
- Max Span
- 10.4 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 25
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $120,000
- Total Project Cost
- $201,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.