M469 over DRY CREEK

1.6 MI E OF M465 · County 107, California · Built 1934 · 2 Lanes · 100 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
46C0121
Year Built
1934
Reconstructed
2002
Length
9 m (29.5 ft)
Max Span
8.7 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
100
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.