STATE ROUTE 245 over KAWEAH RIVER

06-TUL-245-4.23 · County 107, California · Built 2023 · 2 Lanes · 3,450 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
46 0277
Year Built
2023
Length
71 m (232.9 ft)
Max Span
15 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
3,450
Material
Prestressed Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.