SR 190 over SR 65

06-TUL-190-R15.21-PTRV · County 107, California · Built 1971 · 6 Lanes · 17,400 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
46 0225
Year Built
1971
Length
90.8 m (297.9 ft)
Max Span
45.4 m
Width
36 m (118.1 ft)
Lanes
6
Daily Traffic
17,400
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.