SR 190 (AVE 144) over FRIANT-KERN CANAL

06-TUL-190-11.97 · County 107, California · Built 1949 · 2 Lanes · 6,975 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
46 0156
Year Built
1949
Length
25.9 m (85 ft)
Max Span
12.8 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
6,975
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.