WHITLEY AVE over SWEET CANAL

0.8 MI W TULARE CO LINE · County 031, California · Built 1918 · 2 Lanes · 2,060 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
45C0008
Year Built
1918
Reconstructed
1952
Length
14.9 m (48.9 ft)
Max Span
4.9 m
Width
10.6 m (34.8 ft)
Lanes
2
Daily Traffic
2,060
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.