SOUTH FIRST STREET over SAN LORENZO CREEK

0.15 MI NW LONOAK RD · County 053, California · Built 2009 · 2 Lanes · 6,518 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
44C0188
Year Built
2009
Length
73.9 m (242.5 ft)
Max Span
29.3 m
Width
15.2 m (49.9 ft)
Lanes
2
Daily Traffic
6,518
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.