RELIZ CYN RD over RELIZ CREEK
0.6 MI S/O ELM AVE · County 053, California · Built 1953 · 2 Lanes · 150 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 4 | Poor |
Location
36.272211, -121.301181
This bridge is in worse condition than 92.9% of bridges in County 053. The average bridge in California is 0 years old; this one is 73 years old.
Nearby Bridges
ELM AVE over ARROYO SECO RIVER
Built 1943
RELIZ CYN RD over RELIZ CREEK
Built 1953
PINE AVE over CLARK COLONY WATER CANAL
Built 1962
THORNE ROAD over ARROYO SECO RIVER
Built 2010
S GREENFIELD over US HIGHWAY 101
Built 1961
ELM AVE over US HIGHWAY 101
Built 1961
OAK AVENUE over US HIGHWAY 101
Built 1961
WALNUT AVE over US HIGHWAY 101
Built 1961
EL CAMINO REAL over US HIGHWAY 101
Built 1961
LOS COCHES ROAD over SPRECKELS CANAL
Built 1940
Bridge Details
- Structure #
- 44C0128
- Year Built
- 1953
- Length
- 8.2 m (26.9 ft)
- Max Span
- 7.9 m
- Width
- 6.7 m (22 ft)
- Lanes
- 2
- Daily Traffic
- 150
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $126,000
- Total Project Cost
- $212,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.