NACIMIENTO LAKE DR over KEMP CANYON CREEK
NEAR JOLON RD · County 053, California · Built 1961 · 2 Lanes · 380 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
35.872528, -120.838064
This bridge is in worse condition than 6.1% of bridges in County 053. The average bridge in California is 0 years old; this one is 65 years old.
Nearby Bridges
JOLON RD over KEMP CANYON CREEK
Built 1942
US HIGHWAY 101 SB over JOLON ROAD
Built 1936
JOLON RD-S101 ONRP over KEMP CANYON CREEK
Built 1942
US HIGHWAY 101 NB over JOLON ROAD
Built 1964
US HIGHWAY 101 NB over BRADLEY RD
Built 1965
BRADLEY RD over SALINAS RIVER
Built 1931
US HIGHWAY 101 NB over SAN ANTONIO RIVER & DR
Built 1965
US HIGHWAY 101 SB over SAN ANTONIO RIVER & DR
Built 1965
NACIMENTO LAKE DR over SAN ANTONIO RIVER
Built 2023
U.S. HIGHWAY 101 over CAMP ROBERTS EQUIP UC
Built 1965
Bridge Details
- Structure #
- 44C0088
- Year Built
- 1961
- Length
- 11.2 m (36.7 ft)
- Max Span
- 3.8 m
- Lanes
- 2
- Daily Traffic
- 380
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.