LARKIN ST over HARTNELL GULCH
0.05 MI S MADISON ST · County 053, California · Built 1914 · 2 Lanes · 3,000 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
36.596683, -121.9001
This bridge is in worse condition than 66.7% of bridges in County 053. The average bridge in California is 0 years old; this one is 112 years old.
Nearby Bridges
PEARL ST over EL ESTERO LAKE WEST
Built 1991
PEARL ST over EL ESTERO LAKE EAST
Built 1991
STATE ROUTE 1 SB over SOLEDAD DRIVE
Built 1968
STATE ROUTE 1 NB over SOLEDAD DRIVE
Built 1968
STATE ROUTE 1 NB over IRIS CANYON ROAD
Built 1968
STATE ROUTE 1 SB over IRIS CANYON ROAD
Built 1968
STATE ROUTE 1 SB over N1-MUNRAS AVE OFF RAMP
Built 1968
STATE ROUTE 1 NB over N1-MUNRAS AVE OFF RAMP
Built 1968
STATE ROUTE 1 SB over FREMONT ST-N1 & AGUAJITO
Built 1968
STATE ROUTE 1 NB over FREMONT ST-N1 & AGUAJITO
Built 1968
Bridge Details
- Structure #
- 44C0082
- Year Built
- 1914
- Reconstructed
- 2007
- Length
- 32.9 m (107.9 ft)
- Max Span
- 18.7 m
- Width
- 10.8 m (35.4 ft)
- Lanes
- 2
- Daily Traffic
- 3,000
- Material
- Concrete
- Design
- Arch - Deck
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.