SANBORN RD over UP RR & AMTRAK

0.3 MI N ABBOT ST · County 053, California · Built 1948 · 2 Lanes · 28,392 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
44C0039L
Year Built
1948
Length
259.4 m (851 ft)
Max Span
15.2 m
Width
9.6 m (31.5 ft)
Lanes
2
Daily Traffic
28,392
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$2,486,000
Total Project Cost
$4,200,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.