SAN MIGUEL CANYON over U.S. HIGHWAY 101

05-MON-101-96.14 · County 053, California · Built 2004 · 3 Lanes · 11,900 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
44 0271
Year Built
2004
Reconstructed
2012
Length
58.9 m (193.2 ft)
Max Span
33.4 m
Width
16.6 m (54.5 ft)
Lanes
3
Daily Traffic
11,900
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.