US HIGHWAY 101 NB over UP RR AMTRAK FRONT ST

05-MON-101-62.70 · County 053, California · Built 1960 · 2 Lanes · 18,200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
44 0091R
Year Built
1960
Length
95.5 m (313.3 ft)
Max Span
28 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
18,200
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.