ROSA MORADA ROAD over ARROYO DOS PICACHOS
0.6 MI E FAIRVIEW RD · County 069, California · Built 1940 · 1 Lanes · 1,200 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
36.893789, -121.352183
This bridge is in worse condition than 65.8% of bridges in County 069. The average bridge in California is 0 years old; this one is 86 years old.
Nearby Bridges
DOOLING ROAD over ARROYO DOS PICACHOS
Built 1940
FAIRVIEW ROAD over ARROYO DOS PICACHOS CRK
Built 2002
LONE TREE ROAD over ARROYO DOS PICACHOS CRK
Built 2008
FALLON ROAD over SANTA ANA CREEK
Built 2004
MC CLOSKEY ROAD over SANTA ANA CREEK
Built 1994
FAIRVIEW ROAD over ARROYO DE LAS VIBORAS
Built 1920
STATE ROUTE 156 over TEQUISQUITA SLOUGH
Built 1966
PACHECO HIGHWAY over TEQUISQUITA SLOUGH
Built 1920
STATE ROUTE 156 over SANTA ANA CREEK
Built 1997
SAN FELIPE ROAD over SANTA ANA CREEK
Built 1975
Bridge Details
- Structure #
- 43C0041
- Year Built
- 1940
- Length
- 9.4 m (30.8 ft)
- Max Span
- 9.1 m
- Width
- 4.6 m (15.1 ft)
- Lanes
- 1
- Daily Traffic
- 1,200
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.