ENNIS ROAD over SAND CREEK

0.6 MI S GEORGE SMITH RD · County 019, California · Built 2022 · 2 Lanes · 675 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
42C0697
Year Built
2022
Length
31.6 m (103.7 ft)
Max Span
29.3 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
675
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.