N TEMPERANCE AVE over GOULD CANAL

0.2 M N/O DAKOTA AVE · County 019, California · Built 2010 · 4 Lanes · 4,200 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
42C0668
Year Built
2010
Length
7.1 m (23.3 ft)
Max Span
3.4 m
Width
33.8 m (110.9 ft)
Lanes
4
Daily Traffic
4,200
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.