FRONTAGE ROAD over FOWLER SWITCH CANAL
0.3 MI E. OF NEWMARK AVE · County 019, California · Built 2014 · 2 Lanes · 50 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
36.736642, -119.528319
This bridge is in worse condition than 15% of bridges in County 019. The average bridge in California is 0 years old; this one is 12 years old.
Nearby Bridges
STATE ROUTE 180 over FOWLER SWITCH CANAL
Built 2015
STATE ROUTE 180 over LONE TREE CANAL
Built 2015
STATE ROUTE 180 over LONE TREE CANAL
Built 2015
SOUTH FRONTAGE RD over LONE TREE CANAL
Built 2014
S QUALITY AVE over FOWLER SWITCH CANAL
Built 1940
S RAINBOW AVE over C & K CANAL
Built 1925
E CALIFORNIA AVE over C & K CANAL
Built 1991
STATE ROUTE 180 over KINGSBURG CANAL
Built 1950
N OLIVER AVE over C & K CANAL
Built 1940
S ACADEMY AVE over FOWLER SWITCH CANAL
Built 2009
Bridge Details
- Structure #
- 42C0660
- Year Built
- 2014
- Length
- 15.1 m (49.5 ft)
- Max Span
- 15.1 m
- Width
- 10.6 m (34.8 ft)
- Lanes
- 2
- Daily Traffic
- 50
- Material
- Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.