E MICHIGAN AVE over HERNDON CANAL

WEST OF MILLBROOK AVE · County 019, California · Built 1954 · 2 Lanes · 2,121 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
42C0535
Year Built
1954
Length
18.3 m (60 ft)
Max Span
6.7 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
2,121
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.