N CHATEAU FRESNO over HOUGHTON CANAL
0.5 MI SOUTH OF BELMONT · County 019, California · Built 1925 · 2 Lanes · 500 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
3
Serious
Superstructure
3
Serious
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 3 | Serious |
| Superstructure | 3 | Serious |
| Substructure | 5 | Fair |
Location
36.742497, -119.934261
This bridge is in worse condition than 99.7% of bridges in County 019. The average bridge in California is 0 years old; this one is 101 years old.
Nearby Bridges
N MONROE AVE over HOUGHTON CANAL
Built 1925
N GRANTLAND AVE over HOUGHTON CANAL
Built 1940
N ROLINDA AVE over HOUGHTON CANAL
Built 1942
W BELMONT AVE over HOUGHTON CANAL
Built 1970
W NORTH AVE over DRY CREEK CANAL
Built 1975
W. NIELSEN AVE over HOUGHTON CANAL
Built 2005
W CHURCH AVE over DRY CREEK CANAL
Built 1925
STATE ROUTE 180 WB over MARKS AVE
Built 2008
STATE ROUTE 180 EB over MARKS AVE
Built 2008
N MARKS AVE over HOUGHTON CANAL
Built 2005
Bridge Details
- Structure #
- 42C0486
- Year Built
- 1925
- Length
- 10.1 m (33.1 ft)
- Max Span
- 4.9 m
- Width
- 7.4 m (24.3 ft)
- Lanes
- 2
- Daily Traffic
- 500
- Material
- Wood or Timber
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $170,000
- Total Project Cost
- $285,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.