N FRUIT AVE over HOUGHTON CANAL

AT NIELSEN AVE · County 019, California · Built 1954 · 2 Lanes · 1,135 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
7
Good

Bridge Details

Structure #
42C0452
Year Built
1954
Length
6.7 m (22 ft)
Max Span
3.2 m
Width
11.8 m (38.7 ft)
Lanes
2
Daily Traffic
1,135
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$79,000
Total Project Cost
$132,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.