EXCELSIOR AVE over FRESNO SLOUGH OVERFLOW

.2 MI W/O GRANTLAND AVE · County 019, California · Built 1975 · 2 Lanes · 90 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
42C0367
Year Built
1975
Length
26.5 m (86.9 ft)
Max Span
6.4 m
Width
8.7 m (28.5 ft)
Lanes
2
Daily Traffic
90
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.