E CENTRAL AVE over ALTA EAST BRANCH CANAL

0.01 MI E OF PEDERSON AVE · County 019, California · Built 1960 · 2 Lanes · 1,000 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
42C0358
Year Built
1960
Length
28.3 m (92.8 ft)
Max Span
9.1 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
1,000
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.