W ASHLAN AVE over HERNDON CANAL

EAST OF WEST AVE · County 019, California · Built 1967 · 4 Lanes · 24,979 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
42C0191
Year Built
1967
Reconstructed
1974
Length
18.3 m (60 ft)
Max Span
17.8 m
Width
30 m (98.4 ft)
Lanes
4
Daily Traffic
24,979
Material
Prestressed Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.