Mt Whitney Ave over San Luis Canal

10.6 MI WEST OF SR 269 · County 019, California · Built 1966 · 2 Lanes · 1,050 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
42C0159
Year Built
1966
Length
71 m (232.9 ft)
Max Span
22.5 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
1,050
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Bureau of Reclamation
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.