E JENSEN AVE EB over FOWLER SWITCH CANAL

0.3 MI W OF BETHEL AVE · County 019, California · Built 1925 · 2 Lanes · 13,400 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
42C0054R
Year Built
1925
Reconstructed
1955
Length
29 m (95.1 ft)
Max Span
7.2 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
13,400
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.