STATE ROUTE 269 over ARROYO PASAJERO CREEK

06-FRE-269-11.23 · County 019, California · Built 2019 · 2 Lanes · 4,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
42 0452
Year Built
2019
Length
152.4 m (500 ft)
Max Span
12.2 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
4,500
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.