SB 99 OFF-RAMP over PEDESTRIAN & BIKE PATH

06-FRE-099-29.42 · County 019, California · Built 2023 · 4 Lanes · 3,000 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
42 0445J
Year Built
2023
Length
11.1 m (36.4 ft)
Max Span
10.4 m
Width
19.4 m (63.6 ft)
Lanes
4
Daily Traffic
3,000
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.