E180-E168 CONNECT over SR 41-E180 CONNECT

06-FRE-180-R58.60 · County 019, California · Built 2014 · 3 Lanes · 115,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
42 0443G
Year Built
2014
Length
169.2 m (555.1 ft)
Max Span
49.7 m
Width
18 m (59.1 ft)
Lanes
3
Daily Traffic
115,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.