STATE ROUTE 180 over DRY CREEK CANAL

06-FRE-180-R56.10-FRE · County 019, California · Built 2003 · 8 Lanes · 16,000 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
42 0423
Year Built
2003
Length
6.4 m (21 ft)
Max Span
3.2 m
Lanes
8
Daily Traffic
16,000
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.