CEDAR AV-E180 ONRP over CHESTNUT AVENUE

06-FRE-180-R61.00 · County 019, California · Built 2005 · 1 Lanes · 2,200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
42 0399S
Year Built
2005
Length
64.1 m (210.3 ft)
Max Span
31.8 m
Width
9 m (29.5 ft)
Lanes
1
Daily Traffic
2,200
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.