STATE ROUTE 41 over DRY CREEK CANAL

06-FRE-041-R25.26-FRE · County 019, California · Built 1980 · 8 Lanes · 111,000 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
42 0382
Year Built
1980
Length
9.1 m (29.9 ft)
Max Span
4.4 m
Lanes
8
Daily Traffic
111,000
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.