W168-W180 CONNECTR over OLIVE AVE

06-FRE-168S-R0.52-FRE · County 019, California · Built 1999 · 2 Lanes · 62,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
42 0333F
Year Built
1999
Length
52.4 m (171.9 ft)
Max Span
52.4 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
62,300
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.