INTERSTATE 5 SB over TUMEY GULCH

06-FRE-005-44.93 · County 019, California · Built 1967 · 2 Lanes · 16,500 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
7
Good
Substructure
4
Poor

Bridge Details

Structure #
42 0246L
Year Built
1967
Length
22.4 m (73.5 ft)
Max Span
21.3 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
16,500
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$660,000
Total Project Cost
$1,108,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.