STATE ROUTE 269 over INTERSTATE 5
06-FRE-269-0.40 · County 019, California · Built 1967 · 2 Lanes · 4,650 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
36.076567, -120.102047
This bridge is in worse condition than 15% of bridges in County 019. The average bridge in California is 0 years old; this one is 59 years old.
Nearby Bridges
AVENAL CUT-OFF RD over INTERSTATE 5
Built 1969
INTERSTATE 5 SB over QUIST RD
Built 1970
INTERSTATE 5 NB over QUIST RD
Built 1970
QUEBEC AVE over INTERSTATE 5
Built 1969
Avenal Cutoff Road over San Luis Canal
Built 1968
Plymouth Ave over San Luis Canal
Built 1965
West Jayne Ave over San Luis Canal
Built 1966
JAYNE AVE over INTERSTATE 5
Built 1967
INTERSTATE 5 SB over FARM EQUIP UC
Built 1967
INTERSTATE 5 NB over FARM EQUIP UC
Built 1967
Bridge Details
- Structure #
- 42 0230
- Year Built
- 1967
- Reconstructed
- 2004
- Length
- 90.5 m (296.9 ft)
- Max Span
- 46.3 m
- Width
- 13.4 m (44 ft)
- Lanes
- 2
- Daily Traffic
- 4,650
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.