AVENUE 15 1/5 over FUTURE HIGH SPEED RAIL
NEAR INTERSECT OF ROAD 29 · County 039, California · Built 2022 · 2 Lanes · 1,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
36.974333, -120.019714
This bridge is in worse condition than 5.2% of bridges in County 039. The average bridge in California is 0 years old; this one is 4 years old.
Nearby Bridges
AVE 15 over M I D CANAL
Built 1977
AVENUE 15 over FUTURE HIGH SPEED TRAIN
Built 2020
AVE 15 1/2 over MID CANAL (AVE 15 1/2)
Built 1953
ROAD 29 over M I D CANAL
Built 1977
CLEVELAND AVE over FRESNO RIVER
Built 1988
RAYMOND RD 415 over FRESNO RIVER
Built 1971
ISLAND DR (D300) over FRESNO RIVER
Built 1973
LAKE ST over FRESNO RIVER
Built 1968
STATE ROUTE 145 over CITY CANAL
Built 1935
S GATEWAY DR over SR 99
Built 1958
Bridge Details
- Structure #
- 41C0231
- Year Built
- 2022
- Length
- 142.8 m (468.5 ft)
- Max Span
- 44.7 m
- Width
- 13 m (42.7 ft)
- Lanes
- 2
- Daily Traffic
- 1,000
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- Other State Agencies
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.