RIVER VIEW DRIVE over FRESNO RIVER

500 FT E. OF GOLDSIDE DR · County 039, California · Built 1980 · 2 Lanes · 500 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
41C0218
Year Built
1980
Length
35 m (114.8 ft)
Max Span
8.4 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
500
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.