ROAD 23 over DRY CREEK

0.1 MILE N OF AVE 18 · County 039, California · Built 2021 · 2 Lanes · 2,263 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
41C0213
Year Built
2021
Length
24.4 m (80.1 ft)
Max Span
23.5 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
2,263
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.